Residential

Filtration Products

Water Well Products

Water Well Accessories

Installation and Electrical Accessories

Sewage Pump Disconnects

Visit our e-stores

Spin-Down® Sediment Trapper Filter (combo style)

Spin Down Conversion Chart
Part Number Description Pcs/Ctn Master Ctn Overall Length Flow (GPM) Connection Mesh Width
FC8-1000LB COMB PREFLTR LNG BWL 1000 MESH 1 6 18 7/8 18-100 2 slip 1000 5 1/2
FC8-60LB COMBO PREFLTR LNG BOWL 60 MESH 1 6 18 7/8 18-100 2 slip 60 5 1/2
FC8-500LB COMBO PREFLTR LNG BWL 500 MESH 1 6 18 7/8 18-100 2 slip 500 5 1/2
FC8-40LB COMBO PREFLTR LNG BOWL 40 MESH 1 6 18 7/8 18-100 2 slip 40 5 1/2
FC8-30LB COMBO PREFLTR LNG BOWL 30 MESH 1 6 18 7/8 18-100 2 slip 30 5 1/2
FC8-250LB COMBO PREFLTR LNG BWL 250 MESH 1 6 18 7/8 18-100 2 slip 250 5 1/2
FC8-24LB COMBO PREFLTR LNG BOWL 24 MESH 1 6 18 7/8 18-100 2 slip 24 5 1/2
FC8-140LB COMBO PREFLTR LNG BWL 140 MESH 1 6 18 7/8 18-100 2 slip 140 5 1/2
FC8-100LB COMBO PREFLTR LNG BWL 100 MESH 1 6 18 7/8 18-100 2 slip 100 5 1/2
FC6-1000LB COMB PREFLTR LNG BWL 1000 MESH 1 6 16 5/8 10-50 1 1/2 slip 1000 5 1/4
FC6-60LB COMBO PREFLTR LNG BOWL 60 MESH 1 6 16 5/8 10-50 1 1/2 slip 60 5 1/4
FC6-500LB COMBO PREFLTR LNG BWL 500 MESH 1 6 16 5/8 10-50 1 1/2 slip 500 5 1/4
FC6-40LB COMBO PREFLTR LNG BOWL 40 MESH 1 6 16 5/8 10-50 1 1/2 slip 40 5 1/4
FC6-30LB COMBO PREFLTR LNG BOWL 30 MESH 1 6 16 5/8 10-50 1 1/2 slip 30 5 1/4
FC6-250LB COMBO PREFLTR LNG BWL 250 MESH 1 6 16 5/8 10-50 1 1/2 slip 250 5 1/4
FC6-24LB COMBO PREFLTR LNG BOWL 24 MESH 1 6 16 5/8 10-50 1 1/2 slip 24 5 1/4
FC6-140LB COMBO PREFLTR LNG BWL 140 MESH 1 6 16 5/8 10-50 1 1/2 slip 140 5 1/4
FC6-100LB COMBO PREFLTR LNG BWL 100 MESH 1 6 16 5/8 10-50 1 1/2 slip 100 5 1/4
  • Versatile "combo" head (with removable bushing and 1-1/4" threaded plug) allows 90º "L" connection or 180º in-line "T" connection.
  • "Spin-down" action separates heavier-than-water particles away from the screen and into the collection chamber as lighter-than-water particles are removed by the screen.
  • Clear bowl permits monitoring of trapped sediment.
  • Sediment can be drained through Flush Valve (PIBV2T-R included) in bottom of bowl without disconnecting system.
  • Bowl can be easily removed without tools** for total cleaning.
  • Includes PTFE Thread Seal Tape.
  • Maximum pressure: 150 psi at 73º F